Project Overview

1.1 Background

Keelung Harbor Keelung Harbor

1.2 Objectives

(1) Develop the design for the Joint Office Building and Car Park that will accommodate the offices of the Bureau's existing units and associated CIQS units.
(2) Develop the design for "Landmark Architecture" that will create a new "Gateway to the Nation" motif.
(3) Develop the design for the unused land behind Wharves W4 ~ W6 for handling goods from cross-strait passenger and cargo ships.
(4) Develop the design for a modern passenger and cargo terminal, transfer station and maritime gateway art plaza that will improve the quality of passenger and cargo services provided by the harbor, accelerate development in the surrounding areas and promote local prosperity.
(5) Integrate plan with the other commercial buildings on the site when we use the whole floor area ratio (FAR)210%.

Keelung Harbor

1.3 Scope

Required Area Usage Plan
○Harbor Bureau Building, Passenger & Cargo Terminal Usage Plan

The Use Required Area  m2
Harbor Bureau Building 53,077
Passenger & Cargo Terminal 29,538
Total 82,615

○Parking Space Requirements

Space Description Quantity Unit Area m2 Required Area m2 Remarks
Car Parking Space 1,014 35 35,490 to be located underground
Coach Parking Space 28 105 2,940 To be located on 1F
Total 38,430